[Case Study] Proposal for Improving Productivity through Preventive Maintenance of Pumps
Introduction of a case where visualizing machinery has achieved the eradication of unexpected troubles and stable operations.
At a certain house manufacturer's factory, 60 pumps were being used for wastewater treatment purposes. These pumps had been operating without maintenance since the establishment of the factory, and the current condition of the equipment and the degree of aging were not understood. Therefore, we implemented the installation of management tag number plates on all the pumps. As a result, it became possible to conduct planned preventive maintenance (consideration of renewal and repair timing), reducing the risk of unexpected equipment troubles. [Challenges] ■ Unable to grasp the current condition of the equipment and the degree of aging ■ Unable to carry out planned maintenance activities ■ There was a possibility of equipment shutdown due to failure, requiring emergency response *For more details, please refer to the PDF document or feel free to contact us.
- Company:前嶋 本社
- Price:Other